Where and how to drill joists for electrical cables or.
Doubled floor joist with another joist near.
Used twice the number of screws as what it called for.
Notching wood and boring rules engineered i beam rules.
Holes anywhere in the web area of engineered i joists except within 6 in.
Eurocode 5 offers good advice on how this should be done and covers the size of nail or bolt and their location and centres.
This allows you to install a supporting post off the double floor joist to hold a second storey or a roof beam.
Through bolting would ve been better.
Of walls and rim joists.
Drill holes with a diameter of no more than one third the depth of the joist staying 2 in.
The purpose of the headers are to transfer the floor load to the adjacent trimmer joists.
If i was making beams instead of double joists i would ve put the screws closer to the edge like maybe 1 instead of 2.
Putting a partition directly over a single joist increases the load on the joist by 71 to 95 it s even worse if the joists were sized for a 30 psf bedroom load.
In a perfect world any floor joist that is cut should have a header installed preferably two and doubled adjacent joists.
Because of this the tail end of the new lumber is not supported.
I was just following the instructions in a diy book.
You can drill 1 1 2 in.
You can never ever ever notch or bore through the top or bottom flange or chord.
If you are doubling up floor joists creating trimmers or trimming joists around stairs and chimneys they all need connecting properly so that they can act as a single unit.
Usually when a joist gets sistered the new lumber does not span the entire length of the old joist.
In fact most have little perforated knockout holes that can be punched out with the swing of a hammer.
You can get away with this on short spans but you re likely to have problems if the span is near the maximum.
Making double joists yup i think you re right.
Holes anywhere in the web.
All headers should be nailed to the cut joists and their ends attached to two adjacent uninterrupted floor joists.
So instead of having a post run all the way from the roof to the ground it can stop at the double floor joist.
It is important to jack this end level to keep the floor from sagging any more and to keep the joists from splintering later.
The nail specification used is dependent on the thickness of the joists being used.
Away from the top and bottom.
Most new construction uses 2 by 8 lumber for joists although 2 by 6.